Triple

T25501349
Position Surface form Disambiguated ID Type / Status
Subject Słupia River E639119 entity
Predicate hasHydropowerPlant P15311 FINISHED
Object Struga Hydroelectric Power Plant
Struga Hydroelectric Power Plant is a hydroelectric facility located on the Słupia River in Poland, generating renewable electricity from the river’s flow.
E1683268 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Struga Hydroelectric Power Plant | Statement: [Słupia River, hasHydropowerPlant, Struga Hydroelectric Power Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Struga Hydroelectric Power Plant
Triple: [Słupia River, hasHydropowerPlant, Struga Hydroelectric Power Plant]
Generated description
Struga Hydroelectric Power Plant is a hydroelectric facility located on the Słupia River in Poland, generating renewable electricity from the river’s flow.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbd09308190b6b5f0afdc12ec6d completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f5f801e8f8819093ca7a9eb910fd33 completed May 2, 2026, 1:11 p.m.
NED1 Entity disambiguation (via context triple) batch_6a10ad765ad88190ba0777f6b472b008 completed May 22, 2026, 7:24 p.m.
NEDg Description generation batch_6a10ae7ea0088190bdefa7c31fe2859d completed May 22, 2026, 7:29 p.m.
NED2 Entity disambiguation (via description) batch_6a10af719e6c8190bbd23598b3426106 completed May 22, 2026, 7:33 p.m.
Created at: April 21, 2026, 2:45 p.m.