Triple

T25484739
Position Surface form Disambiguated ID Type / Status
Subject Weneg-Nebty E638672 entity
Predicate attestationQuality P66090 FINISHED
Object poorly attested LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: poorly attested | Statement: [Weneg-Nebty, attestationQuality, poorly attested]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: attestationQuality
Context triple: [Weneg-Nebty, attestationQuality, poorly attested]
  • A. attestation
    Indicates a formal declaration or confirmation that something is true, accurate, or has been verified.
  • B. degreeOfAttestation chosen
    Indicates the extent or level to which something (such as a claim, form, or document) is supported, verified, or confirmed by evidence or authoritative sources.
  • C. hasAttestation
    Indicates that there exists a formal confirmation, evidence, or certification supporting the validity or authenticity of something.
  • D. attestationContext
    Indicates the contextual circumstances or conditions under which an attestation is made, such as its scope, environment, or applicable constraints.
  • E. timeOfAttestation
    Indicates the specific time at which a statement, document, or claim is formally attested or verified.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbabeac8190bab30628f8b799d4 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f5f77ad3d0819080476fa776234cd0 completed May 2, 2026, 1:09 p.m.
PD Predicate disambiguation batch_69f468421ba08190880eac99135e5970 completed May 1, 2026, 8:45 a.m.
Created at: April 21, 2026, 2:32 p.m.