Triple
T2545931
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Boring Bricks |
E57901
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recycled building material |
C3734
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recycled building material Context triple: [Boring Bricks, instanceOf, recycled building material]
-
A.
building material
chosen
A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
-
B.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
-
C.
building stone
A building stone is a naturally occurring or processed rock material selected and shaped for use in constructing and facing structures due to its strength, durability, and aesthetic qualities.
-
D.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
E.
retaining wall
A retaining wall is a rigid structure designed to hold back soil or other materials at different elevations, preventing erosion and providing lateral support.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4a5212d88190b989ce129f2ad87f |
completed | March 6, 2026, 9:42 p.m. |
Created at: March 6, 2026, 9:47 p.m.