Triple

T25440232
Position Surface form Disambiguated ID Type / Status
Subject Faculty of Civil Engineering, Chittagong University of Engineering and Technology E637483 entity
Predicate instanceOf P0 FINISHED
Object faculty C57 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75db6c97081908178383fa632b193 completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 2 p.m.