Triple

T25397485
Position Surface form Disambiguated ID Type / Status
Subject Farakka Super Thermal Power Station E636330 entity
Predicate gridConnectivity P24733 FINISHED
Object high-voltage transmission lines LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high-voltage transmission lines | Statement: [Farakka Super Thermal Power Station, gridConnectivity, high-voltage transmission lines]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridConnectivity
Context triple: [Farakka Super Thermal Power Station, gridConnectivity, high-voltage transmission lines]
  • A. gridInterconnection chosen
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • B. connectsIslands
    Indicates a relationship where something (such as a structure, route, or link) joins or provides passage between two or more islands.
  • C. connectedIsland
    Indicates that two islands are linked by a direct or indirect path, such that travel or communication between them is possible within the same connected group.
  • D. connectivity
    Indicates...the existence, degree, or quality of a link or communication pathway between entities, allowing interaction or information flow between them.
  • E. interconnectionMethodToOtherGrids
    Indicates the method or mechanism by which one grid is physically or operationally interconnected to other grids.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75db263888190b77fff9e2827b9a2 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f584f728fc8190982b260fa700002c completed May 2, 2026, 5 a.m.
PD Predicate disambiguation batch_69f45d0dbc8c8190beecce679fce90a4 completed May 1, 2026, 7:58 a.m.
Created at: April 21, 2026, 1:50 p.m.