Triple

T25333328
Position Surface form Disambiguated ID Type / Status
Subject North East Road Sector Development Scheme E635210 entity
Predicate instanceOf P0 FINISHED
Object infrastructure development scheme C44543 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure development scheme
Context triple: [North East Road Sector Development Scheme, instanceOf, infrastructure development scheme]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. infrastructure development zone
    An infrastructure development zone is a designated geographic area prioritized for the planning, investment, and construction of essential public facilities and services—such as transportation, utilities, and communications—to support economic growth and urban or regional development.
  • C. infrastructure funding program chosen
    An infrastructure funding program is a structured initiative that allocates financial resources to plan, build, upgrade, and maintain public facilities and systems such as transportation, utilities, and community services.
  • D. regional development programme
    A regional development programme is a coordinated set of policies, investments, and initiatives designed to stimulate economic growth, improve infrastructure, and enhance social well-being within a specific geographic area.
  • E. planned development
    A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9908108190a95427a97020632a completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:30 p.m.