Triple

T2532284
Position Surface form Disambiguated ID Type / Status
Subject Ashburn station E56187 entity
Predicate partOfExtension P35 FINISHED
Object Silver Line Phase 2 E13084 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Silver Line Phase 2 | Statement: [Ashburn station, partOfExtension, Silver Line Phase 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Silver Line Phase 2
Context triple: [Ashburn station, partOfExtension, Silver Line Phase 2]
  • A. Silver Line chosen
    The Silver Line is a rapid transit route in the Washington Metro system that serves northern Virginia suburbs, including Tysons and Reston, and connects them to Washington, D.C.
  • B. Silver Line
    The Silver Line is a bus rapid transit service in Boston, Massachusetts, operated by the MBTA and serving key corridors including the Seaport District and Logan Airport.
  • C. Red Line Northwest Extension corridor
    The Red Line Northwest Extension corridor is a planned expansion route of Boston's MBTA Red Line intended to extend rapid transit service northwest from its current terminus.
  • D. Blue Line (Washington Metro)
    The Blue Line is one of the primary rapid transit lines of the Washington Metro system, running through downtown Washington, D.C., and connecting key locations in Virginia and Maryland.
  • E. Fairfax Line
    The Fairfax Line was a colonial-era boundary line in what is now West Virginia and Virginia, originally surveyed to define the limits of the vast Northern Neck land grant.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfExtension
Context triple: [Ashburn station, partOfExtension, Silver Line Phase 2]
  • A. extension
    Indicates that one entity is a lengthening, continuation, or added part of another entity beyond its original limits.
  • B. architectOfExtension
    Indicates that one entity served as the architect responsible for designing an extension to another entity (such as a building or structure).
  • C. partOfSystem
    Indicates that one entity functions as a component or subsystem within the structure or organization of another entity.
  • D. hasPart chosen
    Indicates that one entity is a component, segment, or constituent part of another entity.
  • E. extendedBy
    Indicates that one entity builds upon, enlarges, or adds to the scope, functionality, or duration of another entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a48e4f081908f1218d244608659 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd279cf108190b03fb6e0265f39d9 completed March 7, 2026, 7:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69af2bb9c37081909128d7a227651c8b completed March 9, 2026, 8:21 p.m.
PD Predicate disambiguation batch_69abd0c2e34c8190a914d5c2afba147c completed March 7, 2026, 7:16 a.m.
Created at: March 6, 2026, 9:47 p.m.