Triple

T25312819
Position Surface form Disambiguated ID Type / Status
Subject Thinx Poland E634652 entity
Predicate instanceOf P0 FINISHED
Object IXP C2108 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: IXP
Context triple: [Thinx Poland, instanceOf, IXP]
  • A. networking hub
    A networking hub is a central device or platform that connects multiple computers or network devices, enabling data exchange and communication among them within a local network.
  • B. internet infrastructure component chosen
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • C. CEVA station
    A CEVA station is a railway station located along the CEVA (Cornavin–Eaux-Vives–Annemasse) line, serving as a passenger access point to regional and cross-border train services in the Geneva area.
  • D. Internet infrastructure database
    A centralized repository that stores, organizes, and manages detailed information about the components, configurations, and relationships of internet infrastructure such as networks, servers, domains, and routing resources.
  • E. EIT Manufacturing Co-Location Centre
    EIT Manufacturing Co-Location Centre is a regional hub that connects industry, academia, and innovators to collaborate on, develop, and deploy advanced manufacturing solutions within the EIT Manufacturing ecosystem.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9847c08190bb02990d06d5ffb7 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:27 p.m.