Triple
T25259413
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nuclear Power Corporation of India Limited |
E633262
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nuclear power company |
C14601
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nuclear power company Context triple: [Nuclear Power Corporation of India Limited, instanceOf, Nuclear power company]
-
A.
nuclear industry company
chosen
A nuclear industry company is an organization that designs, builds, operates, or services nuclear facilities and technologies for energy production, research, medicine, or defense while managing strict safety, regulatory, and environmental requirements.
-
B.
multinational utility company
A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
-
C.
energy infrastructure company
An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
-
D.
integrated energy company
An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
-
E.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a922ad481908f4f1f884583cb42 |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:13 p.m.