Triple
T25239
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | La Serena |
E503
|
entity |
| Predicate | timeZone |
P109
|
FINISHED |
| Object | Chile Standard Time |
E558
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chile Standard Time | Statement: [La Serena, timeZone, Chile Standard Time]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Chile Standard Time Context triple: [La Serena, timeZone, Chile Standard Time]
-
A.
Chile Standard Time
chosen
Chile Standard Time is the primary time zone used in central Chile, including regions such as Coquimbo, typically set at UTC−4 hours.
-
B.
Chamorro Standard Time
Chamorro Standard Time is the time zone used in Guam and the Northern Mariana Islands, corresponding to UTC+10:00.
-
C.
America/Bogota
America/Bogota is the IANA time zone identifier representing the local time observed in Bogotá, Colombia.
-
D.
Chile
Chile is a long, narrow South American country stretching along the Pacific coast, renowned for its diverse climates, stable economy, and world-class astronomical observatories.
-
E.
Central European Time
Central European Time is a standard time zone used by many countries in central and western Europe, typically one hour ahead of Coordinated Universal Time (UTC+1).
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a243b4ac2c8190b93c303df797b7b2 |
completed | Feb. 28, 2026, 1:24 a.m. |
| NER | Named-entity recognition | batch_69a2466d166881908bd8513c8d09fe8d |
completed | Feb. 28, 2026, 1:35 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a24e5b531481909078feeee5cf26e2 |
completed | Feb. 28, 2026, 2:09 a.m. |
Created at: Feb. 28, 2026, 1:34 a.m.