Triple

T2510713
Position Surface form Disambiguated ID Type / Status
Subject Pride Month E52692 entity
Predicate instanceOf P0 FINISHED
Object annual observance C3739 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: annual observance
Context triple: [Pride Month, instanceOf, annual observance]
  • A. annual event chosen
    An annual event is an occurrence or gathering that takes place once every year on a recurring basis, often following a consistent date, theme, or purpose.
  • B. annual festival
    An annual festival is a recurring, once-a-year event, often rooted in cultural, religious, or community traditions, that brings people together for celebration, rituals, entertainment, and shared activities.
  • C. annual holiday festival
    An annual holiday festival is a recurring, community-centered celebration held once a year to commemorate a specific cultural, religious, or seasonal occasion through shared traditions, events, and activities.
  • D. annual fair
    An annual fair is a recurring, once-a-year public event featuring entertainment, exhibitions, vendors, and community activities, often celebrating local culture or traditions.
  • E. annual cultural festival
    An annual cultural festival is a recurring, scheduled event that showcases and celebrates the traditions, arts, and heritage of a community or culture through performances, exhibitions, and communal activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4958e76481908a235377dd921c9e completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:46 p.m.