Triple

T24977405
Position Surface form Disambiguated ID Type / Status
Subject Phoenix Park E625061 entity
Predicate instanceOf P0 FINISHED
Object park and ride site C10038 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: park and ride site
Context triple: [Phoenix Park, instanceOf, park and ride site]
  • A. park-and-ride facility chosen
    A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
  • B. parking facility
    A parking facility is a designated area or structure that provides organized spaces for vehicles to be temporarily stored.
  • C. パーキングエリア
    パーキングエリアは、高速道路や幹線道路沿いに設けられた、自動車の一時駐車と休憩、トイレや軽食・売店などの基本的サービスを提供する施設である。
  • D. parking garage
    A parking garage is a multi-level or enclosed structure designed to provide organized, secure, and efficient parking spaces for vehicles.
  • E. public park building
    A public park building is a structure within a park that provides shared amenities—such as restrooms, shelters, visitor centers, or recreational facilities—to support and enhance public use of the outdoor space.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff254570819093d197b1900305ac completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 6:02 a.m.