Triple

T24950482
Position Surface form Disambiguated ID Type / Status
Subject Ensaios de Concreto Armado E624318 entity
Predicate instanceOf P0 FINISHED
Object engineering work C49331 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering work
Context triple: [Ensaios de Concreto Armado, instanceOf, engineering work]
  • A. engineering service
    An engineering service is a professional offering that applies scientific and technical expertise to design, analyze, develop, or maintain systems, structures, or processes to meet specific client or project needs.
  • B. engineering profession
    The engineering profession is a field in which individuals apply scientific, mathematical, and technical knowledge to design, develop, and optimize systems, structures, and technologies that solve practical problems and improve society.
  • C. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • D. engineering process
    An engineering process is a structured, iterative sequence of activities and decisions used to design, develop, test, and maintain systems or products to meet specified requirements efficiently and reliably.
  • E. engineering formation
    Engineering formation is the structured process through which individuals acquire the technical knowledge, practical skills, and professional attitudes necessary to practice as engineers within a specific social, educational, and industrial context.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff22e4c48190a0444b5a044f14e8 completed April 18, 2026, 3:48 a.m.
Created at: April 18, 2026, 5:56 a.m.