Triple

T24934806
Position Surface form Disambiguated ID Type / Status
Subject Melbourne tram route 1 E623285 entity
Predicate instanceOf P0 FINISHED
Object Melbourne tram service C46984 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Melbourne tram service
Context triple: [Melbourne tram route 1, instanceOf, Melbourne tram service]
  • A. Yarra Trams service chosen
    A Yarra Trams service is an individual scheduled tram journey operated on Melbourne’s tram network, defined by its route, timetable, and vehicle providing passenger transport between designated stops.
  • B. Sydney Trains station
    A Sydney Trains station is a designated rail facility within the Sydney Trains network where passengers can access, board, alight from, and interchange between suburban train services and related transport modes.
  • C. suburban rail loop
    A suburban rail loop is a circular or semi-circular railway line connecting outer suburbs around a city, enabling cross-suburban travel without passing through the central business district.
  • D. Sheffield Supertram route
    A Sheffield Supertram route is a defined public transport service path within the Sheffield light rail network, specifying the sequence of stops, track segments, and operational patterns followed by trams between termini.
  • E. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac6b5a48190a1c38857f00915a9 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:30 a.m.