Triple

T24929210
Position Surface form Disambiguated ID Type / Status
Subject Adobe CEP panels E618940 entity
Predicate instanceOf P0 FINISHED
Object HTML5-based panel framework C8312 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: HTML5-based panel framework
Context triple: [Adobe CEP panels, instanceOf, HTML5-based panel framework]
  • A. UI framework chosen
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • B. cross-platform UI framework
    A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
  • C. graphical user interface framework
    A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
  • D. browser extension framework
    A browser extension framework is a structured set of APIs, tools, and conventions that simplifies building, integrating, and managing extensions across one or more web browsers.
  • E. desktop widget engine
    A desktop widget engine is a software framework that manages, displays, and updates small interactive applications (widgets) on a user's desktop environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab9edd88190b86004a78a28bc20 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:29 a.m.