Triple
T24917055
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Port Glasgow dry docks (historic) |
E624017
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dry dock complex |
C13901
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dry dock complex Context triple: [Port Glasgow dry docks (historic), instanceOf, dry dock complex]
-
A.
dry dock
chosen
A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
-
B.
docking facility
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
-
C.
shipbuilding facility
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
D.
naval victualling yard
A naval victualling yard is a specialized dockyard facility where food, drink, and other provisions are stored, processed, and supplied to naval ships and personnel.
-
E.
maritime structure
A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac889c081908e9ff686cb428e5a |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:28 a.m.