Triple

T24890860
Position Surface form Disambiguated ID Type / Status
Subject Landkreis Havelland E622995 entity
Predicate instanceOf P0 FINISHED
Object Verwaltungseinheit C49228 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Verwaltungseinheit
Context triple: [Landkreis Havelland, instanceOf, Verwaltungseinheit]
  • A. operational unit
    An operational unit is an organized group, department, or component within a larger system that performs specific tasks or functions to achieve defined operational objectives.
  • B. federal unit
    A federal unit is a constituent political entity, such as a state or province, within a federal system that shares sovereignty with a central government while retaining certain autonomous powers.
  • C. special-purpose governmental unit
    A special-purpose governmental unit is a limited-scope public entity, such as a school district or water authority, created by law to perform a specific governmental function or set of functions within a defined geographic area.
  • D. organizational unit designation
    An organizational unit designation is a label or identifier that specifies a distinct division, department, or functional group within an organization’s structure.
  • E. Staatsamt
    A Staatsamt is a governmental office or state authority responsible for carrying out specific public administrative functions within a country’s political and legal framework.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac597708190a922bf39a49ec70a completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 5:26 a.m.