Triple
T24883103
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gold Star Memorial Bridge |
E622767
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Interstate Highway bridge |
C958
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Interstate Highway bridge Context triple: [Gold Star Memorial Bridge, instanceOf, Interstate Highway bridge]
-
A.
highway bridge
chosen
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
B.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
road and rail bridge
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
-
D.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
E.
causeway-style bridge
A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac4aa848190b3446a3922cec150 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:25 a.m.