Triple
T24862844
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baxter Springs Independent Oil and Gas Service Station |
E622198
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roadside architecture |
C49196
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roadside architecture Context triple: [Baxter Springs Independent Oil and Gas Service Station, instanceOf, roadside architecture]
-
A.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
B.
traffic island
A traffic island is a raised or painted area in the roadway that separates traffic flows, provides pedestrian refuge, or guides vehicle movement for safety and organization.
-
C.
roadside marker
A roadside marker is a fixed object placed along a road to provide drivers with information, guidance, or warnings about location, boundaries, or conditions.
-
D.
architecturalConcept
An architecturalConcept is an abstract idea or guiding principle that informs the overall design, organization, and experiential qualities of a built environment.
-
E.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fac350d08190b3affde1b451a8c5 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 5:22 a.m.