Triple
T2485050
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Abruzzi Spur |
E55905
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | K2 route |
C2414
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: K2 route Context triple: [Abruzzi Spur, instanceOf, K2 route]
-
A.
ice climbing route
An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
-
B.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
C.
mountain trail
chosen
A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
-
D.
mountaineering expedition
A mountaineering expedition is an organized journey by a team to plan, approach, and ascend challenging mountain terrain, managing technical, environmental, and logistical risks to reach specific climbing objectives.
-
E.
multi-pitch climbing route
A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e670a88190b928e08302381710 |
completed | March 6, 2026, 9:40 p.m. |
Created at: March 6, 2026, 9:45 p.m.