Triple

T24840943
Position Surface form Disambiguated ID Type / Status
Subject Inga I Dam E621610 entity
Predicate locatedIn P40 FINISHED
Object Inga, Democratic Republic of the Congo
Inga, Democratic Republic of the Congo, is a locality on the Congo River best known as the site of major hydroelectric installations, including the Inga I Dam.
E1654246 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Inga, Democratic Republic of the Congo | Statement: [Inga I Dam, locatedIn, Inga, Democratic Republic of the Congo]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Inga, Democratic Republic of the Congo
Triple: [Inga I Dam, locatedIn, Inga, Democratic Republic of the Congo]
Generated description
Inga, Democratic Republic of the Congo, is a locality on the Congo River best known as the site of major hydroelectric installations, including the Inga I Dam.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fac185d48190a0a6073ad1f6b792 completed April 18, 2026, 3:30 a.m.
NER Named-entity recognition batch_69f422c934788190b35dff1e4c43ece5 completed May 1, 2026, 3:49 a.m.
NED1 Entity disambiguation (via context triple) batch_6a101c4d268081908fa119333d0ec727 completed May 22, 2026, 9:05 a.m.
NEDg Description generation batch_6a102814f838819094ed41d653039f72 completed May 22, 2026, 9:55 a.m.
NED2 Entity disambiguation (via description) batch_6a10294485508190a91d9ec391181047 completed May 22, 2026, 10 a.m.
Created at: April 18, 2026, 5:18 a.m.