Triple

T2481693
Position Surface form Disambiguated ID Type / Status
Subject Panhandle Route E55830 entity
Predicate alsoKnownAs P39 FINISHED
Object Pan Handle Route E55830 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pan Handle Route | Statement: [Panhandle Route, alsoKnownAs, Pan Handle Route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pan Handle Route
Context triple: [Panhandle Route, alsoKnownAs, Pan Handle Route]
  • A. Route 2
    Route 2 is a major state highway in Massachusetts that serves as a key commuter route between the Boston area and the state's northwestern regions.
  • B. Route 1
    Route 1 is a major Massachusetts Bay Transportation Authority (MBTA) bus line in Boston and Cambridge that connects Harvard Square to Dudley/Nubian Square via Massachusetts Avenue.
  • C. Cofiroute
    Cofiroute is a French toll road concession company that finances, builds, and operates motorway and tunnel infrastructure.
  • D. Panhandle Route chosen
    The Panhandle Route was a major American railroad line operated by the Pittsburgh, Cincinnati, Chicago and St. Louis Railroad that connected key Midwestern and Eastern cities as part of the Pennsylvania Railroad system.
  • E. Stopselzieher route
    The Stopselzieher route is a popular via ferrata climbing path that provides a secured ascent to the summit area of Germany’s highest mountain, the Zugspitze.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e670a88190b928e08302381710 completed March 6, 2026, 9:40 p.m.
NER Named-entity recognition batch_69abd161bf3c8190834502968180e9cf completed March 7, 2026, 7:18 a.m.
NED1 Entity disambiguation (via context triple) batch_69af17b48d0881909442717d318a6f05 completed March 9, 2026, 6:55 p.m.
Created at: March 6, 2026, 9:45 p.m.