Triple

T24797481
Position Surface form Disambiguated ID Type / Status
Subject Thun campus E620427 entity
Predicate instanceOf P0 FINISHED
Object Empa site C49562 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Empa site
Context triple: [Thun campus, instanceOf, Empa site]
  • A. Eawag site
    An Eawag site is a physical location or facility operated or studied by Eawag where environmental water research, monitoring, experiments, or related activities are conducted.
  • B. DLR station
    A DLR station is a designated stop or terminal along the Docklands Light Railway network where passengers can board, alight, and transfer between automated light rail services.
  • C. EIT Manufacturing Co-Location Centre
    EIT Manufacturing Co-Location Centre is a regional hub that connects industry, academia, and innovators to collaborate on, develop, and deploy advanced manufacturing solutions within the EIT Manufacturing ecosystem.
  • D. Fraunhofer Institute
    A Fraunhofer Institute is a research organization within the Fraunhofer Society that conducts applied scientific and engineering research to develop practical innovations for industry and society.
  • E. site of Chemnitz University of Technology
    The site of Chemnitz University of Technology is the physical and organizational location encompassing its campuses, buildings, facilities, and infrastructure where the university’s academic, research, and administrative activities take place.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fabe77c8819085f7ce6486248139 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 4:48 a.m.