Triple
T24790236
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 広陵高等学校 |
E620231
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 私立学校 |
C21029
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 私立学校 Context triple: [広陵高等学校, instanceOf, 私立学校]
-
A.
附属学校
附属学校是指隶属于某一高等院校或科研机构,在其指导下开展基础教育或专业教育的学校。
-
B.
independent preparatory school
chosen
An independent preparatory school is a privately funded, non-governmental institution that provides primary and/or secondary education designed to prepare students academically and personally for entry into selective secondary schools or higher education.
-
C.
independent boarding school
An independent boarding school is a privately funded residential educational institution where students live on campus and receive both academic instruction and pastoral care outside of government control.
-
D.
international school
An international school is an educational institution that offers a globally oriented curriculum, often in a common world language, to a culturally diverse student body and typically follows international standards or programs such as the IB or Cambridge.
-
E.
Sino-foreign cooperative university
A Sino-foreign cooperative university is a higher education institution jointly established and operated by Chinese and foreign partners, integrating international curricula, governance, and resources within China’s regulatory framework.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2fabe77c8819085f7ce6486248139 |
completed | April 18, 2026, 3:30 a.m. |
Created at: April 18, 2026, 4:47 a.m.