Triple

T24744244
Position Surface form Disambiguated ID Type / Status
Subject Objeto ativo: Série branca E618650 entity
Predicate instanceOf P0 FINISHED
Object concrete art C49103 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete art
Context triple: [Objeto ativo: Série branca, instanceOf, concrete art]
  • A. neo-concrete artwork
    A neo-concrete artwork is an abstract, often geometric piece that emphasizes sensory experience, viewer participation, and organic expression over strict rationalism and rigid formalism.
  • B. concrete artist
    A concrete artist is a creator who focuses on non-representational, often geometric compositions that emphasize pure visual elements like color, form, and structure rather than depicting recognizable subjects.
  • C. conceptual art piece
    A conceptual art piece is an artwork in which the primary focus is on the idea or concept being expressed, rather than on traditional aesthetic, material, or technical concerns.
  • D. readymade sculpture
    A readymade sculpture is an artwork created by selecting and presenting an ordinary, often mass-produced object as a sculpture, typically with minimal alteration, to challenge traditional notions of art and authorship.
  • E. Constructivist artwork
    A constructivist artwork is a geometric, often abstract piece that emphasizes industrial materials, functional structure, and the integration of art with modern technology and social purpose.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab8f95c81908bb9e552cf3280c2 completed April 18, 2026, 3:30 a.m.
Created at: April 18, 2026, 4:20 a.m.