Triple

T2474419
Position Surface form Disambiguated ID Type / Status
Subject United States federal armory at Harpers Ferry E55053 entity
Predicate instanceOf P0 FINISHED
Object weapons manufacturing facility C4731 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: weapons manufacturing facility
Context triple: [United States federal armory at Harpers Ferry, instanceOf, weapons manufacturing facility]
  • A. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • B. manufacturing plant chosen
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • C. arms manufacturer
    An arms manufacturer is a company or entity that designs, produces, and supplies weapons, ammunition, and related military equipment for use by armed forces, security agencies, or private clients.
  • D. military installation
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • E. former armory
    A former armory is a building originally constructed or used for storing and maintaining weapons and military equipment that has since been decommissioned or repurposed for other functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e279e88190ab10d7248aea9d11 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:45 p.m.