Triple

T24729659
Position Surface form Disambiguated ID Type / Status
Subject Mk 41 VLS E618249 entity
Predicate instanceOf P0 FINISHED
Object vertical launching system C26799 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: vertical launching system
Context triple: [Mk 41 VLS, instanceOf, vertical launching system]
  • A. vertical launch system chosen
    A vertical launch system is a ship- or land-based arrangement of vertical cells that store, protect, and rapidly fire missiles straight up before they pitch toward their targets.
  • B. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • C. fully reusable launch system
    A fully reusable launch system is a space launch architecture in which all major components (such as boosters, upper stages, and spacecraft) are recovered, refurbished, and flown again, minimizing expendable hardware and reducing per-launch costs.
  • D. space launch support vehicle
    A space launch support vehicle is a specialized ground or aerial platform that transports, positions, services, and supports rockets or spacecraft before and during launch operations.
  • E. heavy-lift launch vehicle
    A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2fab772608190b74163751047ff50 completed April 18, 2026, 3:29 a.m.
Created at: April 18, 2026, 4:02 a.m.