Triple
T24699720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sea Lion Stadium |
E611697
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | marine animal show venue |
C8327
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: marine animal show venue Context triple: [Sea Lion Stadium, instanceOf, marine animal show venue]
-
A.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
B.
aquatic show
chosen
An aquatic show is a live performance featuring trained marine animals, synchronized swimming, water-based stunts, and visual effects presented in or around a pool or aquatic environment.
-
C.
marine animal
A marine animal is a living organism that inhabits saltwater environments, such as oceans and seas, and is adapted to life in or near the water.
-
D.
marine park area
A marine park area is a designated ocean or coastal zone managed to conserve marine ecosystems and biodiversity while allowing regulated recreation, education, and sometimes sustainable use.
-
E.
animal exhibit area
An animal exhibit area is a designated space within a zoo or similar facility where animals are displayed in environments designed to support their welfare while enabling public viewing and education.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4d76d148190b58ad612467149a5 |
completed | April 17, 2026, 11:40 p.m. |
Created at: April 18, 2026, 3:22 a.m.