Triple

T24638063
Position Surface form Disambiguated ID Type / Status
Subject EMD 645-series diesel engine E609867 entity
Predicate usedInLocomotiveSeries P156871 FINISHED
Object EMD GP39
The EMD GP39 is a four-axle diesel-electric road switcher locomotive built by General Motors’ Electro-Motive Division in the late 1960s and early 1970s for freight service on North American railroads.
E1685249 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: EMD GP39 | Statement: [EMD 645-series diesel engine, usedInLocomotiveSeries, EMD GP39]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: EMD GP39
Triple: [EMD 645-series diesel engine, usedInLocomotiveSeries, EMD GP39]
Generated description
The EMD GP39 is a four-axle diesel-electric road switcher locomotive built by General Motors’ Electro-Motive Division in the late 1960s and early 1970s for freight service on North American railroads.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d28f848190ac38c400060e943d completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f40f7f76288190badd669ed3221a03 completed May 1, 2026, 2:27 a.m.
NED1 Entity disambiguation (via context triple) batch_6a10ad26d9708190837e274390a9a54a completed May 22, 2026, 7:23 p.m.
NEDg Description generation batch_6a10ae0e67c0819087189306e39cdbc7 completed May 22, 2026, 7:27 p.m.
NED2 Entity disambiguation (via description) batch_6a10ae851d548190a19c0f9293b99e24 completed May 22, 2026, 7:29 p.m.
Created at: April 18, 2026, 2:33 a.m.