Triple

T24637868
Position Surface form Disambiguated ID Type / Status
Subject Sound of Islay tidal energy project E609862 entity
Predicate instanceOf P0 FINISHED
Object marine renewable energy project C8017 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: marine renewable energy project
Context triple: [Sound of Islay tidal energy project, instanceOf, marine renewable energy project]
  • A. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • B. renewable energy power station chosen
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • C. marine attraction
    A marine attraction is a facility or natural site that showcases oceanic or aquatic life and environments for public education, entertainment, and conservation awareness.
  • D. deep-sea exploration project
    A deep-sea exploration project is an organized scientific and engineering endeavor that investigates the physical, biological, and geological characteristics of the ocean’s deepest regions using specialized submersibles, sensors, and data analysis tools.
  • E. offshore wind licensing round
    An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d28f848190ac38c400060e943d completed April 17, 2026, 11:40 p.m.
Created at: April 18, 2026, 2:33 a.m.