Triple
T24637867
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sound of Islay tidal energy project |
E609862
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tidal energy project |
C47831
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tidal energy project Context triple: [Sound of Islay tidal energy project, instanceOf, tidal energy project]
-
A.
tidal causeway
A tidal causeway is a low-lying road or path that connects land to an offshore island or area, which becomes submerged and impassable during high tide and exposed for travel at low tide.
-
B.
tide system
A tide system is a conceptual framework that models the periodic rise and fall of sea levels driven primarily by the gravitational interactions among the Earth, Moon, and Sun, along with local coastal and oceanographic conditions.
-
C.
planned hydroelectric power station
chosen
A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
-
D.
hydroelectric power project proposal
A hydroelectric power project proposal is a formal document outlining the technical, environmental, financial, and regulatory plans for developing a facility that generates electricity from flowing or falling water.
-
E.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4d28f848190ac38c400060e943d |
completed | April 17, 2026, 11:40 p.m. |
Created at: April 18, 2026, 2:33 a.m.