Triple
T24632790
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CNH Industrial |
E609723
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | capital goods company |
C9974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: capital goods company Context triple: [CNH Industrial, instanceOf, capital goods company]
-
A.
manufacturing company
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
B.
industrial holding company
An industrial holding company is a parent corporation that owns controlling interests in multiple industrial or manufacturing businesses, managing them strategically while typically leaving day-to-day operations to subsidiary management.
-
C.
business-to-business company
A business-to-business company is an organization that primarily sells products or services to other businesses rather than directly to individual consumers.
-
D.
refining company
A refining company is a business entity that processes raw materials, such as crude oil or metals, into more valuable, usable products through industrial refining operations.
-
E.
commercial vehicle manufacturer
chosen
A commercial vehicle manufacturer is a company that designs, produces, and sells vehicles intended primarily for business use, such as trucks, buses, and vans, to transport goods or passengers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2c4d28f848190ac38c400060e943d |
completed | April 17, 2026, 11:40 p.m. |
Created at: April 18, 2026, 2:32 a.m.