Triple

T24571513
Position Surface form Disambiguated ID Type / Status
Subject Lough Allen Canal entrance E607973 entity
Predicate instanceOf P0 FINISHED
Object navigation feature C21469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: navigation feature
Context triple: [Lough Allen Canal entrance, instanceOf, navigation feature]
  • A. navigation program
    A navigation program is software that calculates and displays optimal routes, real-time directions, and location-based information to guide users from one place to another.
  • B. navigation system
    A navigation system is a coordinated set of hardware and software components that determines a user's position and provides optimal routes and guidance to reach desired destinations.
  • C. navigator
    A navigator is an entity responsible for determining and directing the optimal path or course from a starting point to a desired destination using available information and tools.
  • D. navigational passage chosen
    A navigational passage is a corridor, channel, or route—often within a building, vessel, or geographic area—designed to guide movement safely and efficiently from one location to another.
  • E. Navigation infrastructure
    Navigation infrastructure encompasses the physical and digital systems, structures, and services that enable the accurate, efficient, and safe movement of people, vehicles, and information through space.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4cdab6c8190aae6e5d3de55c95e completed April 17, 2026, 11:39 p.m.
Created at: April 18, 2026, 2:28 a.m.