Triple

T24516540
Position Surface form Disambiguated ID Type / Status
Subject 2015 Ma–Xi meeting E606384 entity
Predicate instanceOf P0 FINISHED
Object cross-strait meeting C24264 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-strait meeting
Context triple: [2015 Ma–Xi meeting, instanceOf, cross-strait meeting]
  • A. bilateral meeting chosen
    A bilateral meeting is a formal or informal discussion between representatives of two distinct parties, typically organizations or countries, to negotiate, coordinate, or resolve specific issues of mutual interest.
  • B. cross-strait relations body
    A cross-strait relations body is an organization or institution established to manage, negotiate, and coordinate political, economic, and social interactions between two territories separated by a strait, such as mainland China and Taiwan.
  • C. heads of state meeting
    A heads of state meeting is a formal gathering where national leaders convene to discuss, negotiate, and coordinate on political, economic, or security issues of mutual concern.
  • D. diplomatic talks
    Diplomatic talks are formal negotiations between representatives of states or organizations aimed at resolving conflicts, building agreements, and managing international relations through dialogue rather than force.
  • E. Taiwan Strait crisis
    The Taiwan Strait crisis refers to recurring periods of heightened military and political tension between the People’s Republic of China, the Republic of China (Taiwan), and often the United States, centered on sovereignty disputes and the risk of armed conflict across the Taiwan Strait.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4c725148190a4e41577c5cb409c completed April 17, 2026, 11:39 p.m.
Created at: April 18, 2026, 2:24 a.m.