Triple
T24454191
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 東京湾アクアライン |
E616632
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 跨湾道路 |
C4842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 跨湾道路 Context triple: [東京湾アクアライン, instanceOf, 跨湾道路]
-
A.
cross-sea bridge
chosen
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
B.
highway bridge
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
C.
urban bridge
An urban bridge is a man-made elevated structure that spans physical obstacles within a city, such as roads, railways, or waterways, to support the safe and efficient movement of vehicles, pedestrians, and utilities.
-
D.
road and rail bridge
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
-
E.
causeway-style bridge
A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7ef9fe08190a0613908758b4e86 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:18 a.m.