Triple

T24445492
Position Surface form Disambiguated ID Type / Status
Subject South Bay wetlands E616390 entity
Predicate instanceOf P0 FINISHED
Object tidal marsh system C4013 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tidal marsh system
Context triple: [South Bay wetlands, instanceOf, tidal marsh system]
  • A. tidal river system
    A tidal river system is a fluvial environment where river flow interacts with ocean tides, causing periodic reversals or fluctuations in water level, salinity, and flow dynamics along the river’s lower reaches.
  • B. tidal creek
    A tidal creek is a narrow, shallow waterway in coastal or estuarine areas whose flow and water level are strongly influenced by the rise and fall of the tides.
  • C. wetland chosen
    A wetland is a transitional ecosystem between terrestrial and aquatic environments characterized by saturated soils, standing or slow-moving water, and vegetation adapted to waterlogged conditions.
  • D. freshwater tidal estuary
    A freshwater tidal estuary is a low-lying river mouth region where freshwater flows are influenced by ocean tides, causing regular water-level and flow reversals without significant saltwater intrusion.
  • E. estuary
    An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7edca608190aafefc8877a1b4da completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:17 a.m.