Triple
T24434293
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Curecanti Unit |
E616081
|
entity |
| Predicate | damType |
P15960
|
FINISHED |
| Object |
concrete arch dam (Morrow Point Dam)
The Morrow Point Dam is a major concrete double-curvature arch dam on the Gunnison River in Colorado, notable for its role in hydroelectric power generation and water storage within the Curecanti National Recreation Area.
|
E1633833
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: concrete arch dam (Morrow Point Dam) | Statement: [Curecanti Unit, damType, concrete arch dam (Morrow Point Dam)]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: concrete arch dam (Morrow Point Dam) Triple: [Curecanti Unit, damType, concrete arch dam (Morrow Point Dam)]
Generated description
The Morrow Point Dam is a major concrete double-curvature arch dam on the Gunnison River in Colorado, notable for its role in hydroelectric power generation and water storage within the Curecanti National Recreation Area.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7ec44b081909ccaf1f3bbec0641 |
completed | April 18, 2026, 1:01 a.m. |
| NER | Named-entity recognition | batch_69f297855fd08190904eedd2666d9622 |
completed | April 29, 2026, 11:43 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0fe37841808190b020f8605ebe54c2 |
completed | May 22, 2026, 5:02 a.m. |
| NEDg | Description generation | batch_6a0fe3f19fec81909b7dd2fd9975336e |
completed | May 22, 2026, 5:04 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a0fe46b72b48190b2c0d2d9ddaf3107 |
completed | May 22, 2026, 5:06 a.m. |
Created at: April 18, 2026, 2:16 a.m.