Triple

T2442970
Position Surface form Disambiguated ID Type / Status
Subject Shockley–Queisser limit E53321 entity
Predicate instanceOf P0 FINISHED
Object photovoltaic concept C11344 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: photovoltaic concept
Context triple: [Shockley–Queisser limit, instanceOf, photovoltaic concept]
  • A. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • B. battery energy storage system
    A battery energy storage system is an integrated solution that stores electrical energy in batteries for later use, enabling load shifting, backup power, and grid support functions.
  • C. energy storage system
    An energy storage system is a device or group of devices that capture, store, and release energy for later use to improve reliability, efficiency, and flexibility of power supply.
  • D. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • E. grid-scale battery energy storage system
    A grid-scale battery energy storage system is a large, utility-level installation that stores electrical energy in batteries to balance supply and demand, enhance grid stability, and support the integration of variable renewable energy sources.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab495b6dac8190ac82661aa1452222 completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:43 p.m.