Triple
T24422899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Interstate 95 in Springfield, Virginia |
E615772
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | segment of Interstate 95 |
C1129
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: segment of Interstate 95 Context triple: [Interstate 95 in Springfield, Virginia, instanceOf, segment of Interstate 95]
-
A.
highway segment
chosen
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
B.
Interstate business loop
An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
-
C.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
D.
Florida State Road
A Florida State Road is a numbered highway within the state of Florida that is planned, constructed, and maintained by the Florida Department of Transportation as part of the state’s primary roadway network.
-
E.
United States federal road
A United States federal road is a roadway that is part of the national highway system and is funded, regulated, or maintained in whole or in part by the federal government to support interstate travel, commerce, and defense.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7eadb248190a867130fe45f0388 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:14 a.m.