Triple
T24416413
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agua Negra Tunnel |
E615595
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bi-national infrastructure project |
C48020
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bi-national infrastructure project Context triple: [Agua Negra Tunnel, instanceOf, bi-national infrastructure project]
-
A.
cross-border energy infrastructure project
A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
-
B.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
C.
international transport project
chosen
An international transport project is a coordinated initiative that plans, finances, and implements cross-border transportation infrastructure or services to improve connectivity, efficiency, and economic integration between countries.
-
D.
transport infrastructure agreement
A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
-
E.
bilateral commission
A bilateral commission is a formal joint body established by two parties, typically states or organizations, to negotiate, coordinate, and oversee matters of mutual interest.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7e9bfac8190a748952a90957106 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:13 a.m.