Triple

T24416412
Position Surface form Disambiguated ID Type / Status
Subject Agua Negra Tunnel E615595 entity
Predicate instanceOf P0 FINISHED
Object road tunnel project C4139 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road tunnel project
Context triple: [Agua Negra Tunnel, instanceOf, road tunnel project]
  • A. road tunnel chosen
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • B. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • C. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • D. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • E. ropeway
    A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e9bfac8190a748952a90957106 completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:13 a.m.