Triple

T24367458
Position Surface form Disambiguated ID Type / Status
Subject GATS Article XIX E614235 entity
Predicate linkedTo P37 FINISHED
Object GATS Article XXI on modification of schedules
GATS Article XXI on modification of schedules is a provision of the General Agreement on Trade in Services that sets out the procedures and conditions under which WTO members may modify or withdraw specific commitments in their services schedules, including rules on compensation and affected members’ rights.
E1630942 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GATS Article XXI on modification of schedules | Statement: [GATS Article XIX, linkedTo, GATS Article XXI on modification of schedules]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: GATS Article XXI on modification of schedules
Triple: [GATS Article XIX, linkedTo, GATS Article XXI on modification of schedules]
Generated description
GATS Article XXI on modification of schedules is a provision of the General Agreement on Trade in Services that sets out the procedures and conditions under which WTO members may modify or withdraw specific commitments in their services schedules, including rules on compensation and affected members’ rights.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e1e010819098b95eb3f905943d completed April 18, 2026, 1:01 a.m.
NER Named-entity recognition batch_69f29388c9308190a7a70bf75ed1501c completed April 29, 2026, 11:26 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0fd67340e88190a10fae303eec2898 completed May 22, 2026, 4:07 a.m.
NEDg Description generation batch_6a0fd80a10ac8190b701d7a9ecf7c76f completed May 22, 2026, 4:14 a.m.
NED2 Entity disambiguation (via description) batch_6a0fd89cb9a48190a2a92585e369c938 completed May 22, 2026, 4:16 a.m.
Created at: April 18, 2026, 2:01 a.m.