Triple

T24347533
Position Surface form Disambiguated ID Type / Status
Subject Steve Mellor E613685 entity
Predicate instanceOf P0 FINISHED
Object software methodologist C26751 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software methodologist
Context triple: [Steve Mellor, instanceOf, software methodologist]
  • A. software development methodology
    A software development methodology is a structured framework of principles, practices, and processes that guides how software is planned, designed, built, tested, and delivered.
  • B. software consultant chosen
    A software consultant is a professional who advises organizations on how to design, develop, implement, and optimize software solutions to meet business goals and improve operational efficiency.
  • C. software development expert
    A software development expert is a highly skilled professional who designs, builds, optimizes, and maintains complex software systems while applying best practices, architectural principles, and collaborative methodologies to deliver reliable, scalable solutions.
  • D. software engineer
    A software engineer is a professional who designs, develops, tests, and maintains software systems by applying principles of computer science and engineering to solve real-world problems.
  • E. software developer
    A software developer is a professional who designs, writes, tests, and maintains computer programs and applications to solve problems or fulfill specific user needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7ddd29481909e7f539a6072bd71 completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 1:58 a.m.