Triple

T24237183
Position Surface form Disambiguated ID Type / Status
Subject Sydney road network E603116 entity
Predicate includes P1393 FINISHED
Object Lane Cove Tunnel
The Lane Cove Tunnel is a major tolled road tunnel in Sydney, Australia, providing an underground link between the city's northwestern suburbs and the Gore Hill Freeway to ease surface traffic congestion.
E1630006 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lane Cove Tunnel | Statement: [Sydney road network, includes, Lane Cove Tunnel]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lane Cove Tunnel
Triple: [Sydney road network, includes, Lane Cove Tunnel]
Generated description
The Lane Cove Tunnel is a major tolled road tunnel in Sydney, Australia, providing an underground link between the city's northwestern suburbs and the Gore Hill Freeway to ease surface traffic congestion.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953f631c819097cbb421046bd417 completed April 17, 2026, 8:17 p.m.
NER Named-entity recognition batch_69f28a9c5c3081909cfddc8d29121817 completed April 29, 2026, 10:47 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0fc9b4a9288190b17f59d84c8fd866 completed May 22, 2026, 3:12 a.m.
NEDg Description generation batch_6a0fd01bbd5c8190adcc15e752d96149 completed May 22, 2026, 3:40 a.m.
NED2 Entity disambiguation (via description) batch_6a0fd04e4e3c8190bdb77a7c0018ec6d completed May 22, 2026, 3:41 a.m.
Created at: April 18, 2026, 12:03 a.m.