Triple
T24189552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hite |
E599654
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river crossing site |
C12216
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river crossing site Context triple: [Hite, instanceOf, river crossing site]
-
A.
river crossing
chosen
A river crossing is a location or method by which people, animals, or vehicles traverse from one side of a river to the other, using natural shallows, bridges, ferries, or other means.
-
B.
river crossing operation
A river crossing operation is a coordinated military or logistical maneuver to move personnel, vehicles, and equipment across a water obstacle using specialized planning, equipment, and tactics while mitigating environmental and enemy threats.
-
C.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
D.
ancient bridge
An ancient bridge is a historically significant structure built in antiquity to span a physical obstacle such as a river or valley, often showcasing the engineering techniques, materials, and cultural aesthetics of its era.
-
E.
bridge-crossing challenge
A bridge-crossing challenge is a scenario or puzzle in which participants must determine how to move individuals or items across a bridge under specific constraints such as time limits, capacity restrictions, or safety rules.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288cdc8b88190bf2f835d3cb4ca28 |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 11:35 p.m.