Triple

T24075377
Position Surface form Disambiguated ID Type / Status
Subject Cairo alley E596345 entity
Predicate instanceOf P0 FINISHED
Object urban passageway C1088 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban passageway
Context triple: [Cairo alley, instanceOf, urban passageway]
  • A. urban promenade
    An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
  • B. urban arterial road
    An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
  • C. street chosen
    A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
  • D. urban beltway
    An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
  • E. urban street grid
    An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288c3999c8190809b282a04813dec completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 10:42 p.m.