Triple

T2404595
Position Surface form Disambiguated ID Type / Status
Subject San Mateo County Transit District E50246 entity
Predicate instanceOf P0 FINISHED
Object public transportation provider C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transportation provider
Context triple: [San Mateo County Transit District, instanceOf, public transportation provider]
  • A. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. paratransit operator
    A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0339a88190a1207333cd271cc9 completed March 4, 2026, 7:41 p.m.
Created at: March 4, 2026, 7:58 p.m.