Triple

T2400141
Position Surface form Disambiguated ID Type / Status
Subject Vennbahn railway E47746 entity
Predicate instanceOf P0 FINISHED
Object cross-border railway C9303 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-border railway
Context triple: [Vennbahn railway, instanceOf, cross-border railway]
  • A. road–rail border crossing
    A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
  • B. cross-border transport link chosen
    A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
  • C. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • D. cross-border area
    A cross-border area is a geographic region that spans across the boundaries of two or more countries, where social, economic, environmental, and political interactions occur and are often managed through cooperative arrangements.
  • E. international border crossing
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1c450c81909f61abb8b6863885 completed March 4, 2026, 7:38 p.m.
Created at: March 4, 2026, 7:57 p.m.