Triple

T23947541
Position Surface form Disambiguated ID Type / Status
Subject Mi Macro Periférico E602954 entity
Predicate instanceOf P0 FINISHED
Object bus rapid transit in Mexico C35335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus rapid transit in Mexico
Context triple: [Mi Macro Periférico, instanceOf, bus rapid transit in Mexico]
  • A. TransMilenio station
    A TransMilenio station is a designated public transit facility along Bogotá’s bus rapid transit network where passengers access, transfer between, and depart articulated buses via controlled platforms and fare systems.
  • B. estación del Metro de la Ciudad de México
    Una estación del Metro de la Ciudad de México es una instalación de transporte público subterránea o superficial donde los trenes del sistema metro detienen su marcha para permitir el ascenso y descenso de pasajeros, conectando distintas zonas urbanas mediante una red ferroviaria masiva.
  • C. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • D. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • E. bus rapid transit facility chosen
    A bus rapid transit facility is a dedicated infrastructure element—such as stations, lanes, and terminals—designed to support high-capacity, fast, and reliable bus-based public transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953e4924819093f1c24c03476b42 completed April 17, 2026, 8:17 p.m.
Created at: April 17, 2026, 9:18 p.m.