Triple

T23936079
Position Surface form Disambiguated ID Type / Status
Subject A66 E602639 entity
Predicate instanceOf P0 FINISHED
Object trans-Pennine route C1204 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: trans-Pennine route
Context triple: [A66, instanceOf, trans-Pennine route]
  • A. spur route
    A spur route is a short roadway that branches off from a main highway or route to provide direct access to a specific destination or area.
  • B. spur route
    A spur route is a short, secondary road or railway line that branches off from a main route to provide direct access to a specific location or area.
  • C. rail route chosen
    A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
  • D. north–south highway
    A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
  • E. transalpine railway
    A transalpine railway is a rail line that crosses or traverses the Alps, typically using tunnels, viaducts, and mountain passes to connect regions on either side of the mountain range.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953cf6e081909b8e25a10a52dddc completed April 17, 2026, 8:17 p.m.
Created at: April 17, 2026, 9:03 p.m.